HOME / INDUSTRIES
Every industry breaks power differently.
An AI hall asking 132–142 kW from a single rack, a colocation floor that invoices by the outlet, a -48 V telecom plant, a tower nobody will core-drill, a liquid-cooled HPC hall on a five-night schedule, a dusty edge line beside the press — six industries, six constraints, one factory that builds the whole power chain.
INDUSTRY BRIEFS
Pick your constraint. The brief starts there.
NVL72-class racks at 132–142 kW, second-scale GPU ramps against a 1–90 minute grid, campuses sized at 100–750 MW. Read the brief →
Average density hit 27 kW (+69% in a year), tenants bill by the outlet, and unstaffed edge sites cannot wait for a truck roll. Read the brief →
A -48 VDC plant that must keep running beside 54 V AI cages, -40~65°C cabinets, and 4–8 hour versus second-scale backup. Read the brief →
Occupied towers with no slab coring, auditors who want every power event reproducible, and C13 fleets mixed with GPU cages. Read the brief →
Liquid-cooled cabinets at AI-class current, busway cut to measured runs, and delivery locked to a shutdown window. Read the brief →
Dust and vibration on the rack line, PV-storage sites that need DC-side distribution, and edge AI inference that cannot idle a shift. Read the brief →
MARKET PRESSURE
The numbers behind every brief.
Data center power is a $35.14B market in 2025 heading to $50.51B by 2030 at 7.5% CAGR (MarketsandMarkets) — and the rack is where that pressure lands first.
DENSITY LADDER
From 7 kW poster racks to 142 kW NVL72.
Where each industry sits on the density curve — and which VoltFab line carries it.
| Industry | Rack power reality | What breaks first | VoltFab lines on the job |
|---|---|---|---|
| Enterprise (legacy design) | 7–10 kW per cabinet | Branch circuits and 32 A strips | Rack PDU |
| Colocation (2026 average) | 27 kW per rack (+69% YoY) | 5–15 kW-era power walls | PDU + busway |
| Telecom & 5G | -48 VDC plant plus 54 V AI cages | Two voltage worlds in one hut | CRPS + BBU |
| Finance & enterprise retrofit | C13 fleets beside 30 kW+ GPU cages | Slab coring bans, audit trails | Busway + PDU |
| HPC & research | Liquid-cooled cabinets at AI-class current | Shutdown-window logistics | Busway + CRPS |
| AI & hyperscale | 132–142 kW NVL72-class | Grid ramp vs second-scale load | Busway + BBU + supercapacitor |

SIX BRIEFS, ONE FACTORY