
Full-Rack Power, Forged in One Factory.
Rack PDU, BBU, supercapacitor, CRPS server PSU and busway — five power lines on one production floor, delivered as one accountable system for AI-grade racks.
POWER SYSTEMS
Five power lines. One quality system.
Every line shares the same SMT floor, test lab and export compliance chain — so mixed-carton rack programs ship as one order.

Rack PDU
Basic to switched with outlet-level metering, ±1% billing-grade accuracy, 3-phase up to 22 kW+.
Explore Rack PDU →
BBU Battery Backup
51.2V LFP rack backup in OCP ORv3 architecture — UL 1973 / 9540A ready, UN38.3 export docs included.
Explore BBU →
Supercapacitor Modules
48V hybrid LIC modules buffer GPU power transients in milliseconds — 100% DoD, ~15-year service life.
Explore Supercapacitors →
CRPS Server PSU
550W to 5.5kW+ in CRPS/mCRPS form factors, 80 PLUS Titanium 96%, 54V output for GPU racks, N+N redundancy.
Explore CRPS PSU →
Data Center Busway
Open-channel track busway 160–800A, UL 857 listed, tool-free tap-offs with per-tap metering.
Explore Busway →
Integrated Rack Power
Busway + PDU + BBU + supercapacitor + CRPS engineered as one system — single-vendor accountability.
Explore Integration →OEM / ODM PROCESS
From your rack spec to a running rack.
Spec review & DFM
Send your outlet map, runtime targets or busway layout — engineering feedback with DFM notes within 48 hours.
Pilot build & type test
First articles pass functional, hi-pot and type testing; busway taps are 100% pretested to UL 857.
Production & burn-in
SMT lines with AOI and X-Ray feed final assembly; every CRPS and BBU passes 100% burn-in before packing.
Export & logistics
UN38.3, MSDS and PI965/PI966 docs for lithium lines; FOB, CIF and DDP terms supported.

THE FACTORY
One floor from SMT to burn-in.
Seven SMT lines with Yamaha placement and GKG solder-print feed our power assembly bays; a MENTO AOI wall, X-Ray and FAI first-article stations gate every batch before it reaches the 100% burn-in room.
LINE CARD
Rack power line card.
| Line | Capacity | Voltage | Key certs | Lead time | MOQ |
|---|---|---|---|---|---|
| Rack PDU | 16–63A · up to 22 kW+ (3φ) | 120/208/230/400V | UL 62368-1 · CE · UKCA | 15–30 days | 10 pcs |
| BBU | Rack-level, ORv3 48V | 51.2V LFP | UL 1973 · UL 9540A · UN38.3 | 30–45 days | 50 sets |
| Supercapacitor | 48V modules, 100% DoD | 48V LIC | UN38.3 (cells) · RoHS | 30–45 days | 50 sets |
| CRPS PSU | 550W – 5.5kW+ · N+N | 12V / 54V | 80 PLUS Titanium · UL 62368-1 | 30–45 days | 100 pcs |
| Busway | 160–800A track · 80–400A taps | up to 600V | UL 857 · IEC 61439-6 | 45–60 days | Per project |
| Integration | Full-rack, up to 142 kW | 415V AC / 800V DC feed | Program-level bundle | Synced plan | Per project |
INDUSTRIES
Built for the rooms your racks live in.

AI & Hyperscale
Racks at 30–142 kW break legacy distribution — busway, BBU and supercap buffering close the gap.
See the program →
Colocation & Edge
27 kW average density and per-customer billing demand ±1% outlet metering and remote switching.
See the program →
Telecom & 5G
-48VDC legacy meeting 54V AI loads — dual-voltage PDUs and wide-temperature BBU lines bridge both.
See the program →
Finance & Enterprise
Overhead busway avoids core drilling in occupied towers; event logs keep auditors satisfied.
See the program →
HPC & Research
Grant-cycle budgets and shutdown windows need titanium efficiency and synced delivery plans.
See the program →
Industrial & Energy
Dust, vibration and DC-coupled solar sites demand industrial-grade PDUs and DC-side distribution.
See the program →
START A PROGRAM