Integrated AI rack power system in a data center hall
AI DATACENTER POWER · EMS FACTORY

Full-Rack Power, Forged in One Factory.

Rack PDU, BBU, supercapacitor, CRPS server PSU and busway — five power lines on one production floor, delivered as one accountable system for AI-grade racks.

142 kW per-rack power ceiling96% Titanium efficiency±1% billing-grade metering48 h RFQ feedback
$50.5B
Data center power market by 2030 — 7.5% CAGR
27 kW
Average rack density in 2026, up 69% year over year
142 kW
Power draw of a single GB300-class NVL72 rack
15–30 d
Standard PDU lead time, MOQ from 10 pcs

OEM / ODM PROCESS

From your rack spec to a running rack.

Spec review & DFM

Send your outlet map, runtime targets or busway layout — engineering feedback with DFM notes within 48 hours.

Pilot build & type test

First articles pass functional, hi-pot and type testing; busway taps are 100% pretested to UL 857.

Production & burn-in

SMT lines with AOI and X-Ray feed final assembly; every CRPS and BBU passes 100% burn-in before packing.

Export & logistics

UN38.3, MSDS and PI965/PI966 docs for lithium lines; FOB, CIF and DDP terms supported.

VoltFab SMT power electronics production floor

THE FACTORY

One floor from SMT to burn-in.

Seven SMT lines with Yamaha placement and GKG solder-print feed our power assembly bays; a MENTO AOI wall, X-Ray and FAI first-article stations gate every batch before it reaches the 100% burn-in room.

7 SMT lines100% burn-in coverageISO 9001 system

LINE CARD

Rack power line card.

LineCapacityVoltageKey certsLead timeMOQ
Rack PDU16–63A · up to 22 kW+ (3φ)120/208/230/400VUL 62368-1 · CE · UKCA15–30 days10 pcs
BBURack-level, ORv3 48V51.2V LFPUL 1973 · UL 9540A · UN38.330–45 days50 sets
Supercapacitor48V modules, 100% DoD48V LICUN38.3 (cells) · RoHS30–45 days50 sets
CRPS PSU550W – 5.5kW+ · N+N12V / 54V80 PLUS Titanium · UL 62368-130–45 days100 pcs
Busway160–800A track · 80–400A tapsup to 600VUL 857 · IEC 61439-645–60 daysPer project
IntegrationFull-rack, up to 142 kW415V AC / 800V DC feedProgram-level bundleSynced planPer project

START A PROGRAM

Send your rack spec — get a factory quote in 48 hours.

Request RFQ